Pensiro

The Tech track

Built for the way software actually ships.

The Tech track runs Backlog to Deployed with story points, WIP limits enforced by the database, and dashboards read straight from the activity log.

01Columns

Six columns, and a limit the database keeps.

  1. Backlog
  2. Ready for Dev
  3. In Progress
  4. PR Review
  5. QA / Staging
  6. Deployed

WIP limits are enforced by the database on the columns that need them, not just suggested in the UI.

02Estimation

Estimation.

Points, Fibonacci or t-shirt sizing, set per workspace.

03Item types

Three item types.

Feature

A business outcome that groups Stories and Bugs, tracked as a rollup completion percentage.

User Story

The buildable unit, with an acceptance-criteria checklist and As a / I want / So that framing.

Bug

Severity P0 to P3, environment, steps to reproduce, expected versus actual, with error-log attachments and a P0 fast lane that skips the WIP limit.

04Dashboards

Dashboards.

Cumulative flow and cycle time, computed from the activity log, so the team can see where work is piling up and how fast it is actually moving.

Both terms are defined in the glossary.

05Sign-in

Sign-in.

Sign in with email and a password, with Google, or with Apple.

06Questions

Common questions.

How are WIP limits enforced?

At the database level on the board's columns, not only as a client-side warning.

What estimation methods does Pensiro support?

Points, Fibonacci, or t-shirt sizing, set per workspace.

What is on a Bug card?

Severity from P0 to P3, environment, reproduction steps, expected versus actual behavior, and an attachment slot for an error log.

Client words in, dev-ready structure out.

Request early access See pricing

Signups open at launch. Early access reaches the team directly. You can also email support@pensiro.com.